You always hear the phase “9 to 5” and also the song with the same name. Assuming you include 1 hour worth of breaks (30 minute lunch and two 15 minute breaks), you’re only working for 7 hours a day which comes up to 35 hours a week.

Now it feels like you have to work 8 hours a day (for a total of 40 hours of actual work), plus your other time off meaning you’re really there for 9 hours each day (for a total of 45 hours). Am i looking at that wrong, or did expected times change, and if so, when?

  • criitz@reddthat.com
    link
    fedilink
    arrow-up
    0
    ·
    edit-2
    1 month ago

    I work in a salaried office job in the US, and in 2 decades of working at different companies I’ve always worked 9 to 5 AND taken an hour lunch. Of course, I’ve also had plenty of pressure to work outside of those hours when needed. Which escalated to 50-60 hour weeks with night and weekend work at the worst (I left that job shortly after).But I’ve never done 9 to 6 as official hours.

    • socsa@piefed.social
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 month ago

      Same. For professional work nobody really cares how you punch the clock as long as you get your work done and don’t try to be too annoying about your hours. The only time I’ve ever even heard it brought up was when someone tried to work like 5am to 1pm meaning they had a very small window to schedule meetings with normal people.